HERBOLD Meckesheim has just started rebuilding the site destroyed by the devastating blaze

May 15, 2019 – After the devastating fire in September 2018, HERBOLD Meckesheim has just begun rebuilding the destroyed production halls. The whole incoming goods and shipping department, the warehouse as well as parts of the production area were devastated by the flames.

The new buildings comprise a 4000 M2-area and are supposed to be up and running in September 2019.

Testimonial-Hydrozyklontrennstufe-Deutsch-Herbold-Meckesheim

Herbold Meckesheim at the FAKUMA 2017 (17/10/ – 21/10/2017) Hall A6 Stand 6511

HERBOLD’s main emphasis in recycling Herbold Meckesheim’s scope of supply includes machines and plants for size reduction and agglomeration of clean plastics waste as well as for size reducing, washing, separating, drying, and agglomerating contaminated, mixed post-consumer plastics. Special emphasis is on high-performance plants, i.e. over 3 t/h for rigid plastics or over 1 t/h…